Croatia: Peljesac Bridge joined together
Built by China Road and Bridge Corporation (CRBC)
29 July, 18:07The 2,440-metre bridge has 13 spans with pylons made of reinforced concrete, and two lanes. The bridge was built by China Road and Bridge Corporation (CRBC). "This is a project that connects, it does not divide," said Croatian PM Andrej Plenkovic. (ANSA).