Hungary: media, amended loan with Russia on Paks
For two new blocks of the sole country’s nuclear power pla
07 May, 16:35According to the reports, "Hungary will start repaying the loan once the two blocks are connected to the grid and begin production." Russia is financing 10 billion euros of the 12.5 billion project, Bne Intellinews recalled, adding that the two "new blocks were supposed to start operation in 2025-2026, but that deadline will certainly be missed," due to delays in the realization of the project. (ANSA).